Facteur de production (EAU)

Costs of production factors

WATER

Subscription and connection fees Brazzaville and Pointe-Noire

Category I: Installation owner subscribers (Nationals and foreigners)

Meter caliber

Subscriptions

Connections

Study fees

Total

15

28.200

25.000

5.000

56.200

20

36.800

50.000

5.000

91.800

30

58.300

75.000

5.000

138.300

40

110.400

100.000

5.000

215.400

60

162.200

125.000

5.000

292.200

Category II: Tenant subscribers (Nationals and foreigners)

Meter caliber

Subscriptions

Connections

Study fees

Total

15

31.000

25.000

5.000

61.000

20

40.000

50.000

5.000

95.400

30

63.000

75.000

5.000

143.500

40

123.200

100.000

5.000

228.200

60

183.000

125.000

5.000

313.000

Category III: Administrations, companies, traders

Meter caliber

Subscriptions

Connections

Study fees

Total

15

49.600

25.000

5.000

79.600

20

66.200

50.000

5.000

121.200

30

111.500

75.000

5.000

191.500

40

171.400

100.000

5.000

276.400

60

220.000

125.000

5.000

350.000

80

262.800

150.000

5.000

417.800

100

319.000

175.000

5.000

499.000

150

398.400

200.000

5.000

603.400

1. Secondary centers

In the secondary centers, the price of the connection amounts to 95,000 F CFA

2.Industrial water subscription

Les charges d’abonnement varient selon la nature des travaux à réaliser. La base d’estimation est la suivante :

¾  ——————————–25.000 F CFA

1’———————————-50.000 F CFA

1’1/4 —————————–75.000 F CFA

1’1/2 ————————— 100.000 F CFA

2’ ——————————- 100.000 F CFA

NB:'= inch

3.Billing

  • Bimonthly billing

Caliber(mm)

Meter rental (FCFA)

Connection maintenance (FCFA)

15

2.277

1.021

20

4.326

1.205

30

8.346

1.215

40

9.627

1.518

60

10.626

1.821

80

12.144

2.277

100

18.216

3.795

150

18.216

3.795

  • Monthly Billing

Caliber(mm)

Meter rental (FCFA)

Connection maintenance (FCFA)

30

4.173

608

40

4.814

759

60

5.313

911

80

6.072

1.139

100

9.108

1.898

150

9.108

1.898

Source DRB-LCDE Taxes Deux taxes sont pratiquées à savoir : une taxe de 0,25786%/m3 et une surtaxe de 4,08%/m3